Bid evaluation
This article should be read alongside Tender evaluation.
A tender, or 'bid' is a submission made by a prospective supplier in response to an invitation to tender. It makes an offer for the supply of goods and/or services.
Bid evaluation is the process that takes place after the tender submission deadline. It involves the opening and examining of the bids to identify the preferred supplier(s) for the project. Negotiations may then be entered into with one or more suppliers, and the successful supplier awarded the contract.
NB: There may have been a pre-qualification process before bids were invited to reduce the number of potential tenders to those that are genuinely appropriate for the project,
Generally, bid evaluation will be carried out in accordance with evaluation criteria or a selection methodology specified in the invitation to tender. Criteria or other factors that were not included in the invitation to tender should not be used to evaluate bids, and ideally, the same evaluators should evaluate all bids.
Bidding parties should submit clear and well-organised bids, but nonetheless, a great deal of thoroughness is required in the bid evaluation process, to ensure that proposals are properly understood, bids are compliant with invitation to tender, no information is overlooked and that correct conclusions are reached.
An initial review of the offers received is generally undertaken to determine their responsiveness and conformity to the conditions in the invitation to tender documents. Non-compliant bids may be rejected (unless a compliant bid has also been submitted).
A more detailed evaluation of compliant bids may then be undertaken against a number of pass/fail criteria. A technical determination should be made to ascertain whether the bidder’s technical solution is feasible, appropriate and deliverable within certain requirements, i.e. safety and costs. If a consortium has submitted the bid, the proposed project management should be assessed to determine how cohesive it will be in terms of delivering the project.
See Tender evaluation for more information.
There are a number of criteria upon which a preferred bidder can be identified:
- Lowest price
- Most economically advantageous tender (MEAT)
- Mean value
- Exclusion of the extremes
See Contract award for more information.
While it is common for the lowest priced tender to be awarded the contract, other factors – such as relevant experience and the perceived quality of the solution – should also be taken into consideration, as the lowest price does not always result in the best long-term value.
It may be the case that after the initial review only one bid will be sufficiently compliant. The lack of compliance or lack of interest may be because of deficiencies in the tender documents. If this is the case, then the tender documents could be rectified and the tender procedure begun again.
[edit] Related articles on Designing Buildings Wiki
- Best value.
- Best value procurement.
- Bidder.
- Bid writer.
- Competitive tender.
- Construction contract.
- Contract award.
- Contract conditions.
- Contract documents.
- Due diligence when selecting contractors or subcontractors.
- Invitation to tender.
- Letter of award.
- Mid-tender interview.
- Most Economically Advantageous Tender (MEAT).
- Pre-tender interview.
- Procurement route.
- Selection criteria.
- The benefits of e-procurement in construction.
- Tender documentation.
- Tender evaluation.
- Tender processes.
Featured articles and news
A briefing on fall protection systems for designers
A legal requirement and an ethical must.
CIOB Ireland launches manifesto for 2024 General Election
A vision for a sustainable, high-quality built environment that benefits all members of society.
Local leaders gain new powers to support local high streets
High Street Rental Auctions to be introduced from December.
Infrastructure sector posts second gain for October
With a boost for housebuilder and commercial developer contract awards.
Sustainable construction design teams survey
Shaping the Future of Sustainable Design: Your Voice Matters.
COP29; impacts of construction and updates
Amid criticism, open letters and calls for reform.
The properties of conservation rooflights
Things to consider when choosing the right product.
Adapting to meet changing needs.
London Build: A festival of construction
Co-located with the London Build Fire & Security Expo.
Tasked with locating groups of 10,000 homes with opportunity.
Delivering radical reform in the UK energy market
What are the benefits, barriers and underlying principles.
Information Management Initiative IMI
Building sector-transforming capabilities in emerging technologies.
Recent study of UK households reveals chilling home truths
Poor insulation, EPC knowledge and lack of understanding as to what retrofit might offer.
Embodied Carbon in the Built Environment
Overview, regulations, detail calculations and much more.
Why the construction sector must embrace workplace mental health support
Let’s talk; more importantly now, than ever.
Ensuring the trustworthiness of AI systems
A key growth area, including impacts for construction.
Comments
https://autocadfiles.com/amp/residential-house-apartment-design-in-autocad-file-download
Residential House apartment design in autocad file</a> Download file, Bed Room & other room architecture Furniture detail & all interior design, PArking lay-out & Side section & Stair detail.